#652: Tool Batteries, Moldy Sheathing Behind Brick, and Rebuilding Decks

The Fine Homebuilding Podcast

This week's favorite question comes from Jim who asks on Fine Homebuilding's forum if he can replace rotted pressure-treated decking or does he have to rebuild the whole deck.

The FHB Podcast crew talks about cross-compatibility of power tool batteries. Contractor Evan in Dallas is asking how to replace moldy sheathing behind brick without removing the brick. The crew offers their best suggestions and discuss the importance of managing vapor drive behind brick or other reservoir claddings.

Tune in to Episode 652 of the Fine Homebuilding Podcast to learn more about:

  • Power tool battery pack construction and cross-compatibility
  • Deck construction and durability of pressure-treated lumber
  • Brick veneer vapor control and moldy framing and sheathing

Have a question or topic you want us to talk about on the show? Email us at fhbpodcast@taunton.com.

➡️ Check Out the Full Show Notes: FHB Podcast 652

➡️ Learn about SketchUp for Builders by Jon Beer, the new E-learning course from Fine Homebuilding

➡️ Follow Fine Homebuilding on Social Media:

InstagramFacebookTikTokPinterestYouTube

⭐⭐⭐⭐⭐ If you enjoy the show, please subscribe and rate us on iTunes, Spotify, YouTube Music, or wherever you prefer to listen.

2024-10-04 39 min

Available Results

Generated results are saved to the knowledge database for reuse and search.

No generated results are available for this episode yet.

Extract Knowledge

Pick what you want extracted first. Model, scope, and chapter options appear after a template is selected.

Generated results for public episodes are saved to the knowledge database so they can be reused and searched later.

Transcript

No transcript is available for this episode yet.
Sign in to generate a transcript for review.
Sign in

Chapters

No chapters available.