017 - Construction Submittals: No Exceptions Taken
Construction submittals are the quality control checkpoint between design intent and what actually gets built. This episode breaks down what submittals are, the different types, and how the entire submittal process works.
We cover shop drawings, product data, samples, mock-ups, and closeout submittals. Then we walk through the full submittal workflow step by step, including the four review actions and why architects stopped using the word "Approved."
📝 Key topics covered:
-
What construction submittals are and why they matter
-
Types of submittals: shop drawings, product data, samples, and mock-ups
-
The step-by-step submittal process from planning through implementation
-
The four review actions and why "No Exceptions Taken" replaced "Approved"
-
Common submittal problems and how to avoid them
⏱️ Chapters:
(0:00) Introduction
(1:22) What Are Submittals?
(3:18) Types of Submittals
(10:24) The Submittal Process
(17:59) Why Submittals Matter
(20:06) Better Submittal Management
(27:12) Common Problems to Avoid
(31:35) Conclusion and Takeaways
📝 Download the FREE Construction Submittals study notes
🎯 Get access to all ARE study materials with the ARE 101 Membership
🎯 Join our 10-week ARE Boot Camp
📚 Individual ARE Exam Courses:
Available Results
Generated results are saved to the knowledge database for reuse and search.
Extract Knowledge
Pick what you want extracted first. Model, scope, and chapter options appear after a template is selected.